First project implemented in the Middle East – assembly of drive-in racks (2 blocks, 11m high frames, 2,500 pallet positions).
A culture clash that significantly broadened MAXIREM horizons. Good organisation including for instance the dispatch of the necessary equipment to the target destination was needed already before our departure. The project required close collaboration with the local installers.