Miniload material storage system for boxes (48 720 places for boxes, 4 stacker cranes 10 m height, volume 5 200 m3).
The whole, including all necessary settings, had to take 70% of the time normally counted for such a construction, which required the accumulation of a larger team with effective supervision. This allowed for additional help from our side in attaching cladding. The project ended on time without any problems.