BASF DE
DETAILS
Location:Schwarzheide
Implementation:January 2022 - May 2022
DESCRIPTION
The installation involved erecting two self-supporting structures, each 23m tall, significantly higher than their length (17x8m), within a space limited to installations. An additional challenge was the need to create new safety procedures to meet some of the highest work safety requirements we’ve encountered. Each installation is operated by a horizontal stacker and conveyor system.
Automated self-supporting warehouse / BASF DE / 600 industrial pallet spaces; horizontal stacker; warehouse height 23m; volume 6,000 m³ / Schwarzheide / January 2022 – May 2022